Step 3 pour water into the dry mix and allow it to soak in.
No concrete mailbox post.
Avoid unyielding supports such as metal or concrete posts and instead use a 4 x 4 inch wooden support or a 2 inch diameter standard steel or aluminum pipe.
The mayne no dig ground screw helps you install your mayne mail post in a cleaner and easier way.
The no dig ground screw comes with 5 lag bolts and 20 in.
Insert the mailbox post into the hole.
Make sure your desired mailbox post meets federal highway administration recommendations.
A stable post that can bend or fall to the side if hit by a car.
It s also pretty simple to do.
L of rebar for twisting the screw into the ground.
Rules rules rules.
The mailbox post is designed to be installed into the ground as is with nothing inside the post.
The united states post service regulations say that the opening of your mailbox needs to be 6 inches to 8 inches away from the curb and 41 inches to 45 inches above the surface of the road.
How to install a temporary mail box without a post hole digger.
Pour concrete mix in bucket until it is about half full.
The mail service in every country has its own regulations regarding the dimensions and installation of the mailbox.
It s an ideal way to avoid digging a hole and mixing concrete it truly is a time saver.
Step 6 pour about a gallon of water per 50 lb bag into the hole and allow the water to saturate the concrete mix.
For the mailbox installation i was originally going to take the traditional route.
Step 5 fill the hole with fast setting concrete up to 3 to 4 inches below ground level.
Set the post into the hole and attach 2x4 braces to adjacent sides of the post.
Here s the absolute best way to install a mailbox without using concrete.
How to install a mailbox post without concrete.
Two 50 pound bags of fast setting concrete will set a 4 inch by 4 inch or a 4 inch diameter post in a 10 inch diameter hole 2 feet deep.
Step 4 use a level to position the post perfectly vertical.
This is about as cheap a temporary mailbox as you can make.